Interim Timetable Sept 2021

image

An interim timetable has come into effect this week on our services to Cambridge and Kings Cross. GTR are running fewer services to try to maintain reliability in the face of continuing disruption and staff shortages due to coronavirus.

You can read more about the timetable changes here: https://www.thameslinkrailway.com/coronavirus-information/revised-timetable

We have prepared a spreadsheet showing the new timetable – and note the 2 hour gap between the villages and Cambridge between 10.30 and 11.30 and between Cambridge and the villages between 11.30 and 13.30, and we are in discussion with GTR to see if anything can be done about this.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.